Bender Tunnel Training
03.11Dynamic

Front Layout

Complete a controlled full belly-to-belly front layout at a comfortable wind speed while maintaining the intended flight line.

Prerequisite: Belly-to-Back Transitions Over the Head.

Desired outcome: Complete a controlled full belly-to-belly front layout at a comfortable wind speed while maintaining the intended flight line.

Key points:

  • Start low to the net in belly flight and initiate upward movement before rotation.
  • Keep the body long through rotation and use a consistent visual reference.
  • Connect the two transition halves without pausing.
  • Spot the net and return to a controlled belly orientation.

Manual source: Dynamic Progression Coach Manual, Lesson Plan #16.